|
Landing To Landing Style A landing to landing setup is also available. This type of stringer is fabricated to order. Supagal finished stringers are available within 24 hours and Hot Dip Galvanized require a few more days. (We recommend that this type of stringer be purchased prior to erecting the landing to ensure an exact fit).  Standard stringers are fabricated with a Rise of 175mm and a Going of 250mm. Stair Stringers, generally available as a pair, come complete with top hanger brackets & riser brackets HOT DIPPED GALVANISED (HD GAL)
these units are supplied only in the finish of Hot Dip Galvanized Stringers. Hot Dip Galvanizing is a process where the stringer, after manufacture, is completely immersed in molten zinc. This thick metallic zinc coating, that completely covers the stringer surface, providing a superior corrosion resistant finish. There is no need to paint these units but can be if required.
| Choose from the options available: |
| Type: |
|
|